Dear eng Fadi,

ReferenceIn reference to our meeting last week about additional work in task 3 project, here are the following items:

1- Aluminum flashing 1.5mm thick to cover the Silo and cast in
situ upstand, including fixing system, supporting block, connections as specified and shown on drawing no; GN-A-502 detail 12 and Specification.
2- Aluminum flashing between doors and concrete walls in bagging building
.
3- Grating between silo’s shot and concrete floors.
Kindly know that all mentioned items have been shown to your representative
on the site.
All items need to be approved by Dar
.

Feel free to contact
with me if you need any further information to get the work done as soon as possible.

Best regards
,