Please note that, Regardingregarding CTJ details in WS14 system, that we understand your response, Butbut we needrequire shop drawings for thisthese subjects (plan, section , framing elevation & Substructureand substructure arrangement for the Structuralstructural expansion joint details) in upcoming concourse level submissions.
NextThe next point, Regardingregarding CTJ details in WS25 system for Lessless than 50mm cavity, we are referring to concourse level wall cladding shop drawing submissions. For the 600mm cavity, please addedadd the CTJ details in upcoming concourse level shop drawing submissions for the review. Further, on the provided bulk head CTJ details provided, there is no material specification for the supports members &and fixing details. DrawingsThe drawings are incomplete. Please update the bulkhead details &and submit as a package tofor review (via Aconex) for thatto ensure the consistency of the drawings.

The text above was approved for publishing by the original author.

Previous       Next

免费试用

请输入您的信息
请选择修正的语言

请按这里,如果您需要 校对一份Word文档.

eAngel.me

eAngel.me is a human proofreading service that enables you to correct your texts by live professionals in minutes.