CWC management currently uses thea job order costing system because each product, standard windows or custom windows, requires unique designsdesign. CostThe cost of products is determined by actual direct costs and overhead using a predetermined rate to the actual volume of the allocation base (normal costing). CWC allocates their overhead costs using the facility-wide rate, based on machine hours. Total costs for each product are accumulated using the job cost sheet. The product costs for each product fully absorb the manufacturing costs (absorption costing).

The text above was approved for publishing by the original author.

Previous       Next

免费试用

请输入您的信息
请选择修正的语言

请按这里,如果您需要 校对一份Word文档.

eAngel.me

eAngel.me is a human proofreading service that enables you to correct your texts by live professionals in minutes.