EI received eight weeks of training scheme through my university.
There were many rooms:, including pioneers technical systems, print electronic boards, industrialization electronic services, design, and industrial the board electronic boards.
Service measurements for the water, energy, oil, and industrial controls were taken.
I saw the installation of machinery and the connecting of control cables during the undefactory construction factory.
The text above was approved for publishing by the original author.
Previous
     
Next
只需要到您的收件箱,点击我们的确认链接,您将得到正确的信息。如果您希望更正更多的电子邮件,只需要简单的:
或