KindPlyease find attached the file with the updated shop drawing for Part(D) basement floor (supply air duct and return air duct) under stage coordinated with all trades,
according to steel structure (updated for construction).
The text above was approved for publishing by the original author.
Previous
     
Next
只需要到您的收件箱,点击我们的确认链接,您将得到正确的信息。如果您希望更正更多的电子邮件,只需要简单的:
或